top of page

A City That Knew: Negro Housing, Public Responsibility, and the Long Delay in 1940s Wheeling

Writer: Terrill Gosa
Terrill Gosa
Oct 3
7 min read

By the late 1940s, Wheeling did not need to be convinced that its Black housing problem existed. The city had already studied it, documented it, debated it, delayed it, revived it, and explained it in public. That is what makes this collection of newspaper clippings so important.


They do not tell a simple story of one proposed housing project. They tell a much larger story about a city arguing with its own conscience.


Again and again, the articles return to the same basic fact: Black families in Wheeling were living in conditions that civic leaders, ministers, veterans, social workers, newspaper editors, and housing officials openly described as unacceptable. The proposed solution was a public housing project for Black residents, often described in the language of the day as a “Negro housing project.” But between recognition and action stood money, politics, federal rules, local hesitation, war priorities, site questions, and the familiar burden placed on Black communities to wait.


The earliest thread in these clippings reaches back to 1938. That year, Wheeling’s housing needs were studied as part of the city’s public housing planning. The Housing Authority later recalled that the survey found serious inadequacies in the city’s housing stock. It was not just a matter of old buildings. It was a matter of overcrowding, sanitation, affordability, and whether working families had access to decent shelter at all.


That same era produced the Vineyard Hills public housing project, built for white families. At the dedication of Vineyard Hills, Housing Authority chairman Harry C. Miller described the city’s earlier efforts to address low-income housing and noted that officials had also been searching for a suitable site for a Black housing project. The contrast is striking. Vineyard Hills became a visible, completed public achievement. The Black housing project remained a problem under study, a plan on paper, a promise waiting for the right conditions.


Those “right conditions” kept moving.


One article explains that in 1942 the city already had plans and specifications for a 38-unit Black low-rent housing project. The city had even received a construction bid, reported around $280,500. But the project was shelved during World War II. Another clipping reports that only one bid had been received, that it was rejected as too high when administrative costs and contingencies were included, and that the proposed project would have stood on Wheeling Hill near the larger development for white families.


In other words, Wheeling had reached the edge of action and stopped.


The war became one explanation. Cost became another. Federal priorities became another. Yet the need did not pause. Families still lived in the same neighborhoods, under the same conditions, while the paperwork aged.


By 1949, the issue returned with force. A front-page Wheeling Intelligencer article announced that preliminary action on a proposed Black housing project was underway again. The city’s special housing committee planned to gather housing-need information for a future request for federal funds. The project discussed was again a 38-family development. The article noted that plans had been in Washington and that an architect had recently reviewed them and found them still usable.


That detail matters. It means the city was not starting from scratch. Wheeling was reopening an unfinished obligation.


Other articles show how public pressure helped push the issue back onto the table.


Councilman Jack Adams urged action and pointed to newspaper coverage that had exposed poor housing conditions among Black residents. A council committee was formed to study what funds might be available under the new federal housing law. The committee included Adams, Robert L. Plummer, and Jerry Donovan. The discussion was not merely sentimental. Officials debated whether the project could be financed through revenue bonds, whether federal slum-clearance provisions should be used, and how much of the cost the city would have to bear.


The details are revealing. One article explained that Wheeling might have to pay one-third of the cost of a slum-clearance program. Another said the proposed Black housing project could become the city’s first step into a broader slum-clearance program under the new public housing law. The plans called for eight buildings with apartments ranging from one to four bedrooms. The development would displace 38 slum units. The site was described as city property on the hill opposite Vineyard Hills.


But even then, hesitation remained. Harry C. Miller cautioned that the location needed access to schools, stores, churches, and transportation. He also warned that the steep hillside could make construction more expensive. City Solicitor Charles P. Mead explained that Wheeling had to wait for federal regulations and Congressional appropriations before it could know exactly how to proceed. The city was authorized to receive federal aid, but authorization was not the same thing as construction.


The clippings also preserve a painful earlier choice. Miller recalled that around 1938, the Housing Authority had acquired land east of Lincoln School for a Black housing project. But at that time, the Black community expressed a preference for a new school, playground, and swimming pool. Housing was deferred.


That sentence deserves to be read slowly.


It was not that housing was unimportant. It was that Black Wheeling was being asked, in effect, to rank basic needs against each other. A school. A playground. A swimming pool. Decent housing. Each one was necessary. Each one represented dignity. Each one represented a claim to full citizenship. The tragedy is that the community had to choose among them.


This is where the story connects directly to the larger work of the Eugene and Beverly Stradwick Heritage Foundation. We have written often about Wheeling’s Black educational history: the Colored School established by the Board of Education in 1866, the leadership of John W. West, the evolution into Lincoln School, and the long fight to make public education meaningful for Black children. These housing clippings remind us that education never existed in isolation. Children walked to school from homes and alleys and neighborhoods shaped by public policy. A schoolhouse could be a beacon, but a child still had to return home at the end of the day.


The public testimony in these articles makes that connection impossible to ignore.

Richard L. Creighton of the Children and Family Service Association described housing as a basic human need. He warned that overcrowded and unsanitary conditions contributed to juvenile delinquency, tuberculosis, and other harms. Rev. Martin L. Gerhardt of First Presbyterian Church said he favored anything that would improve Black housing conditions. Ernest Mitchell, head of the colored American Legionnaires of Wheeling, was even more direct. He identified outside toilets as one of the most urgent problems and described the stench from Morrow Alley toilets in hot weather as nearly unbearable.


That is not abstract policy language. That is daily life.


The News-Register editorial titled “Some Racial Facts” placed the local issue in a national frame. Responding to Wendell Willkie’s comments on race, the editorial criticized political hypocrisy and identified better housing as one of the most urgent needs facing Black Americans. Then it turned homeward, calling Wheeling a glaring local example. The editorial argued that the Black housing project should have been a priority and, if delayed by wartime conditions, should become a first concern when the war ended.


The power of that editorial lies in its bluntness. Wheeling’s newspapers were not always ahead of their time on race, but here the paper named the contradiction: America could speak grandly about democracy and reconstruction abroad while tolerating shameful conditions at home.


The 1949 articles also show how federal policy shaped local possibility. The new national housing legislation opened a door, but local leaders still had to walk through it. The city debated whether to use revenue bonds, whether to seek slum-clearance aid, how much federal support might be available, and how quickly Wheeling could act. The Public Housing Administration in Washington already had old plans. A representative from the Richmond regional office was expected to come to Wheeling to reactivate the long-dormant project. City officials were studying the law, the financing, the site, and the engineering.

Meanwhile, families waited.


That waiting is the heart of the story.


The clippings show a city with enough information to act. They show public officials who understood the need. They show civic leaders willing to speak. They show a Black community that had already fought for schools, recreation, and dignity. They show newspapers pressing the issue. They show plans, bids, committees, federal contacts, and cost estimates. They also show delay after delay after delay.


By 1949, the cost estimate had risen sharply. Architect Fred Faris reportedly believed the old project could now cost roughly $400,000, noting that construction costs had increased significantly since 1942. The longer the city waited, the more expensive justice became.

That may be the most enduring lesson.


Neglect is never neutral. Delay has a price. When a city postpones decent housing, the cost is paid first by the families forced to live without it. Later, the public pays too, in higher construction costs, deeper inequality, poorer health, strained schools, and lost trust.

For the Foundation, this story belongs beside our work on Lincoln School, Clay School, the Pythian Building, East Wheeling, and the many institutions that sustained Black life in the Upper Ohio Valley. Housing is heritage. Not only beautiful buildings, not only schools and churches and lodges, but also the blocks where families cooked, slept, raised children, took in relatives, endured hardship, and built community.


These clippings do not give us a finished victory story. They give us something more complicated and perhaps more useful: a record of what Wheeling knew, when it knew it, and how long it took to respond.


That record matters.


It reminds us that Black history in Wheeling is not simply a story of exceptional individuals overcoming obstacles, though there are many such individuals. It is also a story of systems: school systems, housing systems, political systems, neighborhood systems, and the uneven distribution of public investment.


The proposed Black housing project of the 1940s was more than a development plan. It was a test of whether Wheeling would treat Black shelter, Black health, Black childhood, and Black family life as public responsibilities.


The clippings show the city wrestling with that question.


Our work now is to make sure the question is not forgotten.


-T


Sources

  • Wheeling Intelligencer and Wheeling News-Register clippings on Black housing, public housing, slum clearance, Vineyard Hills, and the proposed Negro housing project in Wheeling, 1930s-1940s, collected in “Wheeling Intelligencer, Page 1, Friday, July 22nd, 1949 copy.pdf.”

  • Key referenced clippings include articles on the 1938 housing survey; the 1942 plans and bid for a 38-unit Black low-rent housing project; wartime postponement; the Vineyard Hills dedication and Housing Authority history; 1949 city council and Housing Authority discussions; public comments by Richard L. Creighton, Ernest Mitchell, Rev. Martin L. Gerhardt, Harry C. Miller, Jack Adams, William H. Hunter, Charles P. Mead, and Fred Faris; and the editorial “Some Racial Facts.”

bottom of page