top of page

Blueprints, Bulldozers, and Belonging: Wheeling’s Urban Renewal Report of 1970–1971

Oct 20
13 min read

Updated: Nov 9

Part One: Selling the Promise of a New Wheeling


There is a particular kind of optimism that lives in an architectural drawing.


The buildings are clean. The landscaping has already taken root. Parking spaces are orderly, streets are purposeful, and the future appears to have found its proper place.


The Wheeling Urban Renewal Authority’s annual report for 1970–1971 offered readers that future. Across its pages, photographs of deteriorating buildings shared space with redevelopment plans, portraits of public officials, accounts of community meetings, and promises of better housing.


Here was a city preparing to remake itself—and an agency eager to show that the transformation was underway.


But tucked among the maps and accomplishments is a sentence that brings this report directly into the work of the Eugene and Beverly Stradwick Heritage Foundation. Describing buildings acquired for redevelopment, the Authority stated that they represented:

“a major portion of Wheeling’s black ghetto”

The language is the report’s own.



Suddenly, the document becomes much more than an inventory of municipal projects. It becomes a record of government intervention in a Black neighborhood: its housing, its institutions, its landscape, and the lives of people who called it home.


Our earlier housing histories have followed the struggle for decent shelter in Wheeling. This report takes us inside the official machinery charged with changing those conditions. It allows us to examine what city leaders wanted residents to see, what they counted as progress, and what remained beyond the reach of their charts.


A Report with Something to Prove



Prepared by the Wheeling Urban Renewal Authority and submitted to Wheeling City Council, the report covered July 1970 through June 1971. Its preparation was financed partly through a federal advance from the Department of Housing and Urban Development under Title I of the Housing Act of 1949, as amended.


Even the production of the report belonged to the larger federal-local partnership behind urban renewal.


The opening letter, dated July 1971, came from Authority chairman William L. Doepken, president of the Wheeling Corrugating Company. He wrote with pride about the accomplishments of a newly appointed Authority that had taken office in August 1969.

That distinction matters. Urban renewal in Wheeling was already years old.


This leadership group was presenting itself as the team that would bring existing projects into compliance, get stalled development moving, and launch a new neighborhood program.


Its three stated priorities were revealing:

  • Enforce redevelopment obligations in the Center Wheeling project.

  • Establish a workable construction policy for the Ohio Valley General Hospital project.

  • Eliminate substandard housing adjacent to downtown through a Neighborhood Development Program.


The report’s governing philosophy appeared near the end of Doepken’s letter:

“preserving that which is good, rehabilitating that which can be saved, and redeveloping that which is beyond redemption.”

It is a memorable sentence. It also places enormous power in the hands of whoever gets to decide which buildings—and, by extension, which parts of a neighborhood—belong in each category.


The report introduced the people exercising that responsibility. Alongside Doepken were vice chairman Dr. Houston A. Lewis, a dentist; secretary Roger W. Haigh, a West Liberty State College professor; treasurer Clifford Hall, a retired Sears executive; and members Ernest H. Doughty, a land purchasing agent for Hanna Coal Company, and Lawrence J. McCabe, president of McCabe Cleaners.


The staff included director George Cieply, deputy director Denny Naum, relocation director Lou Letzelter, and social services director Bill Robinson.


Behind the institutional initials were identifiable people making consequential decisions about Wheeling’s future.



Before Chapline Street East: The Lessons of Center Wheeling

The report began its project review with Center Wheeling R-1, which it described as West Virginia’s first urban renewal project.



Initiated in 1958, it covered approximately twenty acres between Chapline and Main Streets, from Twenty-third to Twenty-seventh Streets.


The Authority reported that 195 substandard housing structures had been demolished.


The original redevelopment vision called for light industrial uses. When efforts to secure that development proved unsuccessful, the plan changed, and land was sold for “heavy commercial” redevelopment.


That is an important admission inside an otherwise confident publication. Clearing a site did not guarantee that the intended future would arrive.


The report presented the project’s financial results as evidence of success. Before redevelopment, it valued the land and buildings at approximately $300,000. New development, it said, had increased that value to approximately $1.1 million, while annual taxes rose from $8,000 to about $20,000.


Those were numbers city officials could readily promote: increased value, increased revenue, and visible investment.


Yet the report also acknowledged that some new property owners had failed to meet their contractual obligations. The Authority said it had instituted a firm compliance policy to correct the problem.


Even after demolition and land sales, renewal required enforcement. Public action had created expectations that private redevelopment did not automatically fulfill.


For our Foundation, this section raises another question alongside the tax figures: what became of the people whose housing had occupied those twenty acres?


The Center Wheeling discussion offers a much clearer accounting of property values than of former residents’ lives.


A Hospital Expansion—and Another Negotiation over Public Purpose

The Ohio Valley General Hospital R-12 project provided a second example of renewal serving a major institutional objective.


Begun in 1962 and described as “closed out” in 1969, the project encompassed a four-acre block. The Authority had acquired and demolished forty-two structures to make room for hospital expansion.


Plans included new hospital buildings and approximately 330 additional off-street parking spaces.


Construction began in spring 1971 on a medical education and administration building that would include a teaching auditorium seating approximately 230 people. A comprehensive mental health center was also planned west of Eoff Street, opposite the nurses’ residence.


The report placed project execution costs over seven and a half years at approximately $550,000, anticipating $2.75 million in new construction.


Here, renewal promised expanded medical services, professional facilities, and access to care—substantial public benefits.


But the account again contained friction. According to the Authority, hospital officials had believed they possessed greater freedom to develop the tract than their contractual obligations allowed. Negotiations were necessary to reconcile the hospital’s plans with the renewal agreement.


Read together, the Center Wheeling and hospital sections complicate the smooth appearance of the finished report. Progress depended on negotiations, altered plans, and the continuing effort to make redevelopment partners deliver what had been promised.


A Faster Way to Change a City

The report’s central new undertaking was the Neighborhood Development Program, or NDP.



HUD approved Wheeling’s program on April 1, 1970, following an application originally submitted in June 1969 and revised in January 1970.


The Authority explained that this approach differed from earlier renewal programs. Instead of completing lengthy planning for an entire project before securing its overall grant reservation, the NDP allowed rehabilitation, redevelopment, and public improvements to proceed through annual stages.


Planning and implementation could move together.


To the Authority, that meant speed, flexibility, and better management. Its introduction described an “accelerated” form of urban renewal.


The overall NDP area encompassed approximately sixty-six acres, including two residential neighborhoods and a commercial area in the northern portion of the central business district.


Within that larger footprint, different places were assigned different futures. Chapline Street East would undergo extensive clearance and reconstruction. North Wheeling would receive a substantial rehabilitation effort. Downtown commercial renewal remained an ambition, even as federal funding priorities complicated its prospects.


A single program could therefore contain several meanings of “renewal”—and very different experiences for the people living within its boundaries.


Chapline Street East: A Neighborhood Becomes an Action Area

For the history we preserve at EBSHF, the report’s most consequential pages concern Chapline Street East.


This approximately twenty-two-acre area was scheduled for redevelopment in two stages.

The first action area extended from Chapline Street east to Palo Alto Street, and from Eleventh Street north to City Commons.


Within that area, the report documented the acquisition of buildings, the relocation of residents, and demolition on a substantial scale.

Measure

What the report recorded

Buildings acquired

86

Buildings demolished during the reporting period

72

Residents relocated

“87 families and individuals”

Acquisition cost for the first-year action area

$410,000

Reported cost of clearing the land

$117,000

These categories should not be collapsed into one another. Eighty-six buildings did not necessarily mean eighty-six homes. And “87 families and individuals” was not a count of eighty-seven individual people.


Nevertheless, the scale is unmistakable.


A neighborhood was being taken apart while another was being planned in its place.

The report’s acquisition section explicitly identified the area with Wheeling’s Black population. It described severe deterioration, including buildings previously condemned by the city. Its demolition section classified 95 percent of the eighty-six structures as substandard.


Those conditions deserve to be taken seriously. Our housing research has repeatedly encountered the urgency of providing families with safe, sanitary, affordable homes.

At the same time, a building’s condition cannot tell us everything about the life within it.

An inadequate house might still stand next door to a trusted neighbor. A deteriorating block might contain the route to church, a familiar recreation center, or relatives close enough to help with children.


The need for better housing and the value of an existing community could occupy the same street.


That is the tension this report brings into focus.


The Neighborhood Waiting on the Drawing Board

The proposed replacement neighborhood was ambitious.

For the first stage, the report anticipated:

  • A 100-unit high-rise apartment building for elderly residents.

  • Approximately seventy to eighty garden apartments, distributed among three or four structures.

  • Approximately twenty to twenty-four townhouses.


These were prospective developments. At the time of the report, the Authority expected the site to be ready for redevelopment and construction to begin within the next two months.


The second stage extended from Eoff Street east to High Street, and from Twelfth Street north to City Commons.


Within two years of July 1971, the Authority intended to acquire properties, relocate residents, and demolish the structures in that area—with two explicitly named exceptions.


New housing plans for that second stage included another 100 elderly high-rise units, approximately seventy garden apartments, and twenty townhouses.


The completed Chapline Street East neighborhood was intended to serve low-, moderate-, and middle-income families through a combination of high- and medium-density development.


The Authority wanted a “shining example” of physical redevelopment joined to social development.


That promise gives the next annual report something concrete to answer.


How much of the proposed housing moved from drawing to construction?


What happened to the schedule?


And how did the people already relocated fit into the neighborhood being imagined?


Two Institutions the Plan Intended to Keep

Amid the extensive clearance proposed for the second stage, the report named the Jordan Center and Wayman AME Church as exceptions.



For readers following our histories of Black recreation and faith in Wheeling, those names are immediately meaningful.


The Jordan Center belonged to the community history we have been tracing through playgrounds, recreation programs, Charles Street, and the people who fought to provide Black children with places to gather and grow.


Wayman represented another kind of continuity: a congregation and a religious institution within the changing neighborhood.


Their proposed retention suggests that the planners recognized some existing institutions as essential to the new development.


The Jordan Center was also slated for expansion to accommodate a more comprehensive recreation and social service program. The report’s social services section identified its Charles Street location and described the need for additional room and facilities.


That is a significant detail. The center was being positioned as an anchor for the neighborhood’s future.


But will this happen?


Yet preserving an institution and preserving the community around it are connected tasks. A church can remain standing while its members move farther away. A recreation center can survive while the children who once walked there find themselves living elsewhere.


The report gives us the preservation intention. Following the people will help us understand its full meaning.


Relocation: The Moving Truck and Everything It Could Not Carry

The relocation section presented a picture of practical assistance.



The Authority reported:

  • Five grants of $5,000 to help project residents purchase homes.

  • Grants of $500 to seven project-area tenants who became homeowners.

  • Rental assistance payments extending over a two-year period for other eligible residents.

  • Moving expenses of up to $200 for each family.


These were meaningful forms of support. For some residents, relocation assistance could help make homeownership possible. For others, rental aid and moving payments could soften an otherwise difficult transition.


The report deserves credit for recording that assistance.


Its language also reveals how officials understood advancement. Tenants becoming homeowners were described as improving their “way of life.” Homeownership appears as a preferred outcome within the Authority’s account.


What we do not receive is a detailed follow-up on the relocated population.


Where did people move?

What happened to their housing costs? Were their new homes near work, relatives, churches, and familiar services?

How many hoped to return to the redeveloped area?

A moving truck could carry furniture.

The report’s figures do not tell us how well the move preserved the support systems surrounding a family.


Those are questions for the next stage of research—and, especially, for people who remember.


More Than Buildings: The Social Services Promise

One of the report’s strongest themes was that physical redevelopment should be accompanied by social and economic development.



Under social services director Bill Robinson, the Authority developed a program informed by a survey of project-area residents. The report credited the Project Area Committee and graduate students from local and state educational institutions with assisting that work.


The resulting initiatives included referrals to existing welfare agencies, employment opportunities for unemployed or underemployed residents, nutrition and economical meal-planning guidance, and recreation.


The YWCA appeared repeatedly as a partner.


The Authority described arrangements to send young girls to summer camps, sewing classes to develop clothing and home-decoration skills, and swimming classes for project-area residents.


For readers of our histories of Black women’s organizations and youth programs, this is a familiar institutional thread. Community well-being depended on organizations that provided opportunities beyond the home itself.


The annual report treated those services as part of the renewal effort, rather than as incidental activities.


That broader vision is worth recognizing. Better housing mattered enormously, but residents also needed access to work, recreation, practical assistance, and places to meet.


The proposed Jordan Center expansion was intended to give such programming a more permanent home.


North Wheeling: Another Route to Renewal

The report’s North Wheeling section demonstrates that demolition was only one tool available to the Authority.



A three-stage rehabilitation program covered the area from Interstate 70 north to Seventh Street, between the Ohio River and Stone Boulevard.


Physical rehabilitation was scheduled to begin in July 1971, with the second action year.

Plans for the west side of Main Street included a neighborhood park at the foot of Eighth Street, an adjacent fire station, off-street parking, underground utilities, and wider sidewalks landscaped with trees, shrubs, and benches.


Eligible residential property owners could receive loans at three percent interest for terms up to twenty years. The report also described grants of up to $3,500 for families earning less than $3,000 annually, architectural advice, and staff assistance in obtaining financing.

Further stages would address the blocks between Main and Market Streets and an area between Market Street and Stone Boulevard, where some demolition and new garden apartments were anticipated.


Placed beside Chapline Street East, these plans invite a careful comparison.


One area was presented chiefly through clearance and rebuilding; another through rehabilitation, financing, and environmental improvements, although demolition remained part of its later stages.


How were those choices made?

How much depended on building conditions, ownership, financing, or planning priorities? How did race intersect with those decisions?


The report identifies the Black neighborhood directly. It does not provide enough comparable information about both areas to settle those questions. It does, however, show why they belong in our investigation.


Downtown’s Future—and the Problem with Old Buildings

The Authority also wanted to renew Wheeling’s central business district.



Here, it encountered a funding challenge. According to the report, federal priorities favored housing, leaving nonresidential commercial and industrial renewal projects with little prospect of federal support at that time.


The Authority nevertheless argued that downtown redevelopment remained necessary.


It reported that surveys classified approximately ninety percent of downtown structures as substandard and obsolete for modern business use. It pointed to buildings constructed before 1900, worsening traffic congestion, inadequate off-street parking, and merchants’ need for expansion space.


Preliminary investigation of a project without federal assistance was underway.


For a heritage foundation, this section is particularly revealing. The age of a building appears within an argument for modernization. Older structures were being evaluated primarily for how well they served contemporary commercial requirements.


Today, our preservation work asks additional questions about those same kinds of buildings: what happened there, who used them, what they reveal, and what might be lost with their removal.


The report captures a moment when the pressure to make Wheeling competitive and modern could place its older built environment under suspicion.


Participation, Photographs, and the Public Story of Progress

The Authority emphasized citizen participation.


A Project Area Committee operated in Chapline Street East, with a subcommittee in North Wheeling. The report described meetings, public information sessions, and seminars. It credited the exchange of information and ideas with earning residents’ and community leaders’ confidence.


Photographs reinforced that message. Readers saw people in discussion, people receiving services, and officials at work.


The visual story mattered. Alongside pictures of deteriorating structures and demolition, these images presented renewal as organized, consultative, and attentive to human needs.


The planning sections added another layer of professional confidence. A six-year staging program had been prepared. The Authority described computer-assisted scheduling through Program Evaluation Review Technique, or PERT, with monitoring and adjustments when delays occurred.


The city’s transformation was being presented as something that could be planned, coordinated, and managed.


But the report does not reproduce residents’ testimony in comparable detail. We learn that meetings occurred without receiving a full account of disagreements, competing priorities, or changes secured by community participants.


Participation was important enough to advertise. Its practical influence remains an important subject to investigate.


The Ledger Behind the Promise

The report closed with a balance sheet for the NDP program dated May 31, 1971.


It listed total assets of $2,123,530.07, including approximately $49,907 in cash, federal grant receivables, land inventory, investments, and a substantial unused noncash grant-in-aid credit.


On the other side were liabilities and capital, including $865,000 in notes and loans payable.


That total should not be mistaken for an annual spending figure. This was a financial snapshot of assets, obligations, and credits.


Its presence nevertheless helps explain the machinery beneath the photographs. Urban renewal involved acquiring land, borrowing, awaiting federal funds, managing property, and coordinating work over multiple years.


The neatness of a plan depended on a complicated financial process.


And the financial process, in turn, depended on decisions about actual places where people lived.


What Counts as Progress?

The 1970–1971 report offers substantial evidence of activity: property acquisition, demolition, relocation assistance, social services, hospital construction, rehabilitation planning, and efforts to enforce redevelopment agreements.


It also gives us a language of accomplishment.


Land values rose. Taxes increased. Buildings came down. Sites became available. Plans advanced.


Those measures explain how the Authority presented its work to City Council and the public.


For the Eugene and Beverly Stradwick Heritage Foundation, the task is to place another set of measures beside them.


Did families obtain lasting improvements in housing?

Could residents afford the neighborhood being built?

What happened to relationships that had made difficult living conditions bearable? Which institutions survived, and how did their roles change?

Whose memories were preserved when the buildings disappeared?


Our work on Wheeling’s housing conditions makes it impossible to romanticize unsafe homes. Families deserved better.


Our work on Black community life makes it equally impossible to treat a neighborhood as an empty space awaiting improvement.


This annual report sits at that intersection. It records genuine needs, ambitious promises, public investment, and the removal of a substantial part of a Black residential area.

The next report will allow us to follow those promises forward.


For now, this one preserves a city speaking confidently about its future. The Foundation’s responsibility is to make sure that the people who lived through that future remain part of the story.


-T



Historical Terminology Note

This article includes historical terms such as “colored” and “Negro” when quoting original sources or identifying organizations as they were known at the time. These terms reflect the language and racial conditions of their era; their inclusion is not an endorsement of their use today.


In our own narrative, we use Black and African American, as appropriate. We preserve historical wording to document the past faithfully while honoring the dignity, humanity, and experiences of the people whose stories we share.


Sources and Notes


Urban Renewal Authority of Wheeling. Annual Report, July 1970–June 1971. Submitted to Wheeling City Council, 1971. The supplied copy bears Ohio County Public Library identification.

bottom of page